Friday, 28 November 2014

PRODUCTION SEVEN

This week we filmed the rest of the shooting script. At the moment we have done 80% of the script. We just have the remaining 20% to finish. The reason why we could not actually meet the deadline was because our schedules would not meet the days we could film so we needed an extension. However, fingers crossed it will hopefully be all done by Tuesday. Due to this we will have to spend time after school working on our editing. On the bright-side our magazine ad is getting there and is not as bad as we expected.      

Choosing the right background was a very big struggle.As we needed the same sort of synergy shown across our music video and magazine ad on our digipaks as well. So finding the right background was hard. Taking the pictures for our digipak was easy as I knew what I wanted the sort of images for the digipaks. I focused on making the magazine ad and digipak which was simple and easy for me as since I have already made the magazine ad I knew what sort of look I wanted for the digipak. Where as, if my partner decided to there would be no similar coloration between the two. He focused particularly on editing the music video.

PRODUCTION LOG FIVE

This was the week after half term. We carried on making our logistics for our shooting scrip such as where we are filming and what our backup locations are if we cannot film in a certain area. Also this week we worked on our digipaks and magazine ads putting them together and getting feedback on it were needed. Four our magazine ad we wanted something different thanks to Photoshop we could adjust the images used and make it darker and make me and my red dress stand out more. It was quite easy doing the magazine ad as i was doing it myself so it was a lot easier. 

Also, this week we filmed all the drama scenes. these were the performance secnes where i was shown to be singing the song. This was very long for example getting all the equipment our for our wok and putting it back. We started filming at 2 and finished at 5:30pm. However, we got it all filmed and i was happy with the results of our filming.  

production log 4

This we spent our time filming the script. It was very stressful since someday the person we needed was not available. Also since my partner worked some days when the weather was perfect and what we wanted however, because he was working we could not work.

It was very long filming, as we had too take shots five times in order for them to be the correct ones. We were supposed to film this Sunday however due to the horrible weather we could not film. It was stressful as the weather was never right.


However, during this period we also took pictures for our magazine ads and digipak. This was fairly easy as i knew what i wanted pictures wise. The pictures came out fairly nicely and looked pretty good.


Wednesday, 19 November 2014

production log three.

This week I spent time creating my digipak and magazine ad for my artist. This was quite time consuming as I spent ages colouring in all of the digipak and magazine ad. However, the way it came out looked pretty good. However, it will not look the same as we want in real life but it is a little plan of how we want things too look like.

Also, this week we were finishing the remaining script as we have to finish the script before we start taking pictures and filming. So we completed this. Half i did half my partner did. We began too take pictures this week as well.

Pictures were taken for the magazine ad and digipaks, these were all test shots too see how it looks and the lighting we were using and whether we liked it or not. This also helped us we knew what kind of shot types we would consider using.